Category: Total-liban


New filling lane, New filling rack, New pumps and manifold

Posted by Toni bou gharios in Total-liban. Comments Off on New filling lane, New filling rack, New pumps and manifold

13th January



Pipes 6’’ 8″10″12″ Maintenance

Posted by Charbel in CORAL Oil ltd., Total-liban, Uniterminals, Wardieh Holding. Comments Off on Pipes 6’’ 8″10″12″ Maintenance

11th July

 



Generator steel structure support [Simulation – Fabrication – Erection ]

Posted by Charbel in Total-liban. Comments Off on Generator steel structure support [Simulation – Fabrication – Erection ]

18th February



Trenching 10’’ sealine below the seabed up to 2 meters

Posted by Charbel in Total-liban. Comments Off on Trenching 10’’ sealine below the seabed up to 2 meters

11th November



Sea pipeline 10’’ 1200 m covered with concrete [ Fabrication – Erection – Installation ]

Posted by Charbel in Total-liban. Comments Off on Sea pipeline 10’’ 1200 m covered with concrete [ Fabrication – Erection – Installation ]

2nd October



PLEM (pipeline end manifold) [Design – Fabrication – Erection ]

Posted by Charbel in Total-liban. Comments Off on PLEM (pipeline end manifold) [Design – Fabrication – Erection ]

11th September